![]() The appraised value of the structure can be made every 10 years with floodplain Interior improvements valued at up to 50% of Permits prior to construction activities in a floodplain, as well as all Property owners may need to obtain fill permits and/or floodplain alteration Including earthwork, existing or new structures within the regulatory 1% AnnualĬhance (100-year) floodplain are reviewed and evaluated by the City of Dallas toĮnsure that the floodplain criteria are met before permitting construction. Real Time Gauging Data can be found at City of Dallas Flood Control. The City of Dallas Flood Warning System and (Article V of the Dallas Development Code). This approach is outlined in the City of Dallas Floodplain Regulations Non-profit sectors to determine the most feasible approach to managingĭevelopment in and around floodplains. Through various initiatives, the City has worked with the private, public and To floodplain and drainage management that dates back to the early 1970s. The City of Dallas has a comprehensive approach ![]() Floodplain Management Program Information The Enclave at Prairie Creek - FP 22-08 - JPresentation (PDF)ĩ328 Harry Hines Boulevard on Bachman Branch - FP 18-02 - May 2, 2023įor meetings held in prior years, click here. To view the virtual meetings and to learn more about the City's Dam Safety Program visit Floodplain Fill Permit Meeting VideosĬHI Chalk Hill, 1500 N Walton Walker Blvd - FP 22-10 - July 24, 2023Ĥ406 S Ottawa Rd - FP 22-09 - July 17, 2023Ĩ001 North Stemmons Freeway - FP 22-14 - July 7, 2023 The public was invited to attend the virtual meetings to learn more about the program, the benefits of dams, and flood safety. Interim Engineering Program Administrator David Phan, P.E., CFM Dallas Water Utilities - Stormwater Operationsĭallas Water Utilities hosted several virtual public meetings on the City's Dam Safety Program during November 2021.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |